prefabricated concrete structures

Transform your parking into clean energy

Why choose MFPARK?

Discover the advantages that make our MFPARK structure the smart solution for your self-consumption project. A prefabricated solar parking lot made of concrete that eliminates costs, speeds up deadlines, and requires no civil engineering work.

Without Civil Works

With MFPARK you can install prefabricated solar awnings made of concrete for self-consumption without the need for foundation work.

Quick and Efficient Assembly

The prefabricated design and our own models drastically reduce the lead times for manufacturing and assembly, allowing for a quick start-up of your installation.

Innovative and Sustainable Design

Made of low-carbon concrete and recycled materials. A 100% recyclable structure, patented and with a design that adapts to your image.

Prepared for the future:

It includes pre-installation for electric vehicle chargers, adding value to your service and positioning your project at the forefront of sustainable mobility.

ENGINEERING AND CERTIFIED QUALITY

A prefabricated structure,
Designed for sustainable mobility

Each component of MFPARK is selected to ensure maximum durability and exceptional performance. Our engineering meets the most demanding structural standards:

  • Structure: Pre-fabricated concrete porticos of high strength.

  • Cover : Magnelis steel profiles with maximum anti-corrosion protection.

  • Hardware: AISI 304 stainless steel for reliable and durable connection.

  • Certifications: CE marking, ISO 9001, ISO 14001 and compliance with Eurocodes.

MFPARK

The commitment to electric mobility and self-consumption of energy requires structural solutions that combine efficiency, speed of assembly, and sustainability. In line with its commitment to the industrialization of construction, Metal Frame Renovables is launching its new MFPARK system, an innovative prefabricated solar parking system made of concrete, available in single and double versions, that eliminates the need for civil works and offers exceptional technical and economic performance.

(04)

MFPARK 2V SIMPLE

Optimize your parking space by generating clean energy. The MFPARK Simple Precast Concrete MFPARK is designed to combine functionality, sustainability and aesthetics. Ideal for companies, public administrations and residential projects that seek to maximize energy efficiency without complex construction or foundations. With electric recharging vehicle option.

(03)

MFPARK 3V SIMPLE

Turn any parking lot into a renewable energy source. MFR's MFPARK (Single and Double versions) combine robust structure, quick assembly and customizable aesthetics, all without the need for foundations. With electric charging vehicle option.

(02)

MFPARK 4V DOUBLE

Protects vehicles with a sturdy, functional and long-lasting structure. The MFPARK Simple Precast Concrete MFPARK is designed to provide shade and shelter with quick installation and without the need for foundations, ideal for businesses, communities and commercial spaces.

(01)

MFPARK DOBLE 5V

It protects several places simultaneously with a solid, aesthetic and easy-to-install structure. The MFRPARK Double Prefabricated Concrete is the perfect solution for spaces that need a durable shelter without resorting to complex construction or foundations.

01

MFPARK

MFR

Simple 2V

02

MFPARK

MFR

Simple 3V

03

MFPARK

MFR

Double 4V

04

MFPARK

MFR

Double 5V

MFR

Frequently asked questions

We answer the most common questions our customers have about the MFPARK solution.

What type of floor is needed to install MFPARK?

MFPARK is designed to be installed directly on an existing or newly constructed concrete slab, eliminating the need for complex foundations. Our technical team can advise you on the exact requirements for your location.

The design of the cover with solar panels offers excellent protection against rain and sun. For superior sealing, we offer the option of including a drainage system that efficiently manages the water discharge.

Maintenance is practically non-existent. The high-durability prefabricated concrete structure is designed to withstand the most adverse weather conditions for decades without the need for special treatments.

The timeframe is significantly shorter than that of a conventional parking lot. Since it is a prefabricated system without civil works, assembly on site is completed in a matter of days, depending on the size of the project.

Yes. We fully adapt to the corporate image of your project. We can manufacture the concrete pillars in any color of the RAL code and include logos or graphic elements in the structure.

The structure of the MFPARK pylon includes the necessary pipelines and anchor points to facilitate the subsequent installation of one or more charging points for electric vehicles by an installation company.

OUR PROCESS

Your MFPARK Project in 4 Simple Steps

We have optimized our process to be fast, efficient, and of high quality. We eliminate the complications so that you can enjoy your solar parking as soon as possible, from the first contact to commissioning.

Contact and Feasibility Study

Tell us about your idea. Our team of engineers analyzes the needs of your project, the location, and the technical requirements to offer you a customized solution and a detailed budget.

Custom Design and Manufacturing

Once the proposal has been validated, we proceed to the final design and manufacture of the concrete pillars in our facilities using our patented molds, guaranteeing the highest quality.

Logistics and Transportation

We coordinate all the logistics to transport the prefabricated components from MFPARK directly to your location, ensuring a timely delivery in perfect condition.

Quick Assembly on Site

Our specialized team performs the final assembly in record time. Since it does not require complex civil work, the installation is clean, safe, and minimizes any inconvenience, leaving your solar parking lot ready to operate.

What is MFPARK?

MFPARK is a modular photovoltaic canopy designed with prefabricated concrete pylon and Magnelis® steel structure, designed to be installed directly on an existing pavement (minimum 15 cm with a gap), without the need for foundations or cuts in the parking activity.
This solution is aimed at shopping centers, large surfaces, industries and logistics spaces that are committed to self-consumption and the installation of chargers for electric vehicles, without incurring additional costs or technical complications.

Share this:

Before contacting via WhatsApp

We inform you that the data you provide to us will be processed by METAL FRAME RENOVABLES S.L. to answer your query or request. The legal basis is your consent. Data will not be disclosed to third parties, except for legal obligations or suppliers necessary for the provision of the service. You can exercise your rights by writing to info@mfrenovables.com. More information in our Privacy Policy.